
Project 13 · Power systems
Office hybrid power, Port Harcourt
An office installation in Port Harcourt uses SRNE hybrid power equipment and lithium storage. The short visual record concentrates on the installed hardware.
An office in Port Harcourt received an SRNE lithium hybrid power installation in 2022. The two available field photographs concentrate on the paired equipment and how it sits within the office power area, making this a concise equipment-led project record.
Port Harcourt, Rivers State
- Project focus
- SRNE hybrid inverter and lithium storage
- Project category
- Power systems
- Engineering lens
- Two field images record the paired equipment arrangement in an office setting.
- Location
- Port Harcourt, Rivers State
- Installation year
- 2022
- Setting
- Office · commercial
- Equipment
- SRNE hybrid equipment
Site context

Site context

Installed system
Office hybrid power, Port Harcourt, Port Harcourt, Rivers State: field photograph 1 of 2
Project sequence
From site work
to system view.
Each image sequence follows the visible progression of the work: setting, build activity, equipment details and installed system views.
- 01
Site setting
The field photographs place the work at Port Harcourt, Rivers State and show the space around the equipment.
- 02
Engineering equipment
Two field images record the paired equipment arrangement in an office setting.
- 03
Installed arrangement
The remaining views document the assembled system and visible installation details from different angles.
