Project 07 · Rooftop solar
Rooftop solar and hybrid storage, Ogun
A rooftop solar installation in Swimiwa, Ogun State, is paired with a DEYE hybrid inverter, lithium storage and online monitoring. The gallery follows both roof and equipment views.
Solar modules on the roof provide the visible generation side of this Ogun State project. The accompanying DEYE hybrid inverter, lithium battery and online monitoring bring the roof installation into a wider power system. The gallery connects rooftop views with the equipment that stores and manages the energy.
Swimiwa, Ogun State
- Project focus
- Rooftop modules, DEYE hybrid inverter and lithium storage
- Project category
- Rooftop solar
- Engineering lens
- The roof and equipment images connect the generation side with the indoor hybrid system.
- Location
- Swimiwa, Ogun State
- Installation year
- 2022
- Documented ratings
- 15 kW inverter · 45 kWh battery
- Equipment
- DEYE hybrid inverter · online monitoring
Site context

Site context

Installation

Technical detail

Installation

Technical detail

Installation

Technical detail

Installation

Technical detail

Installed system
Rooftop solar and hybrid storage, Ogun, Swimiwa, Ogun State: field photograph 1 of 10
Project sequence
From site work
to system view.
Each image sequence follows the visible progression of the work: setting, build activity, equipment details and installed system views.
- 01
Site setting
The field photographs place the work at Swimiwa, Ogun State and show the space around the equipment.
- 02
Engineering equipment
The roof and equipment images connect the generation side with the indoor hybrid system.
- 03
Installed arrangement
The remaining views document the assembled system and visible installation details from different angles.